broj: 11-12/2021
pdf (11,5 MB) |
|
RIJEČ UREDNIŠTVA | ||
Uredništvo | ||
What does the Glasgow Conference bring us? pdf HR EN | 513 | |
IZVORNI ZNANSTVENI ČLANCI | ||
David Mijoč, Nikola Perković, Mario Šporčić, Matija Landekić, Matija Bakarić, Andreja Đuka, Tomislav Poršinsky | UDK 630*360 +761 https://doi.org/10.31298/sl.145.11-12.1 | |
Evaluation of the method of calculating the planned price of timber harvesting operations pdf HR EN | 515 | |
Summary The paper presents the method of calculating planned prices of timber harvesting operations, which are the subject of public tenders in the forest management company Hercegbosanske šume Ltd. Kupres and the analysis of deviations of the planned from the contracted (realised) prices for timber harvesting operations in 97 groups of compartments, which were the subject of public tenders in 2019 and 2020. Descriptive and correlation statistical analysis also included stand and terrain indicators in groups of compartments in public tenders: area, net volume of marked trees, harvesting density, number of marked trees per hectare, volume of medium marked tree, slope, average timber extraction distance, terrain stoniness and parameter of uphill timber extraction. The test of dependent data pairs indicated that there is a statistically significant difference between planned and contracted prices of timber harvesting operations (t = 7,78, p < 0.001), and the results of correlation analysis confirmed the connection of influential factors of forest operations with the contracted and planned timber harvesting prices. Due to the statistically significant (p < 0.05) and very strong correlation with the contracted and the planned price of the timber harvesting operations calculated by the presented method, the dependence was equalized by a linear regression model with a coefficient of determination of 0.667. In conclusion, the method of calculating the planned price of timber harvesting operations is a good predictor of what can be contracted prices in public tenders thus showing its suitability in future calculations. Weak and negative correlation (p < 0.05, r = -0.22) of the difference between the contracted and planned price of the timber harvesting operations on the volume of the medium marked tree, indicated future monitoring to determine its causes, which could be: 1) mutual competition between timber harvesting operations providers with a larger volume of medium marked tree or 2) overestimation of the volume of medium marked tree in the presented model. Guidelines for increasing the accuracy of determining input parameters (average timber extraction distance, slope, terrain stoniness, and parameter of uphill timber extraction) are also presented. Given that the calculation is related to the average planned price at the level of forest management, which is determined by the management of the company, it is necessary to constantly monitor the market in order to react in time if major oscillations occur. Key words: timber harvesting; planned price; contracted price; market | ||
T. Gomerčić, I. Topličanec, V. Slijepčević, S. Blašković, I. Selanec, I. Budinski, J. Tomaić, J. Kusak, Gj. Ivanov, M. Sindičić | UDK 630* 152 + 146 (001) https://doi.org/10.31298/sl.145.11-12.2 | |
Distribution and minimum population size of Eurasian lynx (Lynx lynx) in Croatia in the period 2018–2020 pdf HR EN | 525 | |
Lovre Panđa, Ante Šiljeg, Ivan Marić, Fran Domazetović, Silvija Šiljeg, Rina Milošević | UDK 630*174.7 https://doi.org/10.31298/sl.145.11-12.3 | |
Comparison of GEOBIA classification algorithms based on Worldview-3 imagery in the extraction of coastal coniferous forest pdf HR EN | 535 | |
Marina Milović, Verica Vasić, Milan Drekić, Branislav Kovačević, Saša Pekeč, Zoran Galić, Saša Orlović | UDK 630* 181.3 + 164 (001) https://doi.org/10.31298/sl.145.11-12.4 | |
Diversity of ectomycorrhizal fungi associated with Quercus petraea in the national park Fruška gora in the Republic of Serbia pdf HR EN | 547 | |
Zafer Yücesan, Derya Bayram | UDK 630* 232.3 (001) https://doi.org/10.31298/sl.145.11-12.5 | |
Effects of pretreatment, sowing time, sowing environment and climate factors on germination in Acer pseudoplatanus L. pdf HR EN | 557 | |
PRETHODNO PRIOPĆENJE | ||
Ivan Balenović, Luka Jurjević, Krunoslav Indir, Ante Seletković | UDK 630* 587 + 622 https://doi.org/10.31298/sl.145.11-12.6 | |
Photogrammetric estimates of stand volume in pedunculate oak stands of the Pokupsko basin pdf HR EN | 567 | |
Branislav Drašković, Marko Gutalj, Stefan Stjepanović, Boban Miletić | UDK 630* 233 https://doi.org/10.31298/sl.145.11-12.7 | |
Estimating recent forest losses in Bosnia and Herzegovina by using the Copernicus and Corine land cover databases pdf HR EN | 581 | |