broj: 11-12/1996
pdf (21,9 MB) |
|
IZVORNI ZNANSTVENI ČLANCI | ||
Orlić, S., Ocvirek, M. | UDK 630* 232.1 001 | |
The Research on the Douglas Fir [Pseudotsuga menziesii (Mirb.) Franco] Provenance in Croatia pdf HR EN | 455 | |
Diminić, D. | UDK 630* 443. 001 | |
Fungus Sphaeropsis sapinea (Fr.) Dyko et Sutton on Pines on the North Adriatic Area pdf HR EN | 463 | |
Pičman, D., Pentek, T. | UDK 630* 383.001 | |
The Use of Soil Stabilization Materials in Forest Road Building pdf HR EN | 469 | |
Juretić, N., Mamula, D., Pleše, N. | UDK 630* 444.001 | |
Plant Viruses in Soil and Water of some Forest Ecosystems in Croatia with Review of Viruses Found in Forest and Ornamental Woody Plants pdf HR EN | 477 | |
PRETHODNO PRIOPĆENJE | ||
Ivanek, Vilim | UDK 630* 114:182.001 | |
Some Soil Properties in the Ecosystems of the Lowland Swampy Grasslands in the Križevci and Vrbovec Regions Compared to the Growth of Tree Species pdf HR EN | 487 | |
STRUČNI ČLANCI | ||
Lneniček, Z. | UDK 630* 641 | |
Developement of the Planning System Model in JP "Hrvatske šume" pdf HR EN | 505 | |
Summary: The planning system of JP " Hrvatske šume " has been developed in two steps. First step was carried out in a traditional way - being descriptional, hand written and mechanical. The description of this step could be found in "Šumarski list" 7-8from 1994. Second step is " informational phase ". Using the informational means and procedures, for the purpose of management, this system was developed. In the year 1994 the project were made and computer programme was implemented in all organizational units (app. 200 units). This system was used for business planning with very good results in 1995. Analizyng the system of "Businessplanning", the basic characteristics of model were determined. They are structure -elements. This model is strictly determined by four variables, as the four-dimension system in space and time. The "Business planning" is the part of the general business information system in enterprise. But this general information system is based on the same characteristics as the newly developed model of business planning. This model, which was developed for planning system is useful for all information systems which could be determined by one time variable and three structural variables with elements which are determined by the same variables. Key words: Planning system; development; information system model; 4dimensional space; original project method | ||
Getz, D. | UDK 630* 156 | |
The Belje Hunting Area - Prized for its Worth and Beauty in Croatia and All Europe pdf HR EN | 513 | |